Asbestos Pipe Replacement project in Greater Banjul Area

Water systems

Asbestos Pipe Replacement

Greater Banjul Area

LocationGreater Banjul Area
Project typeWater systems
Hydrotech focusPipeline Installation & Rehabilitation

Dismantling of existing asbestos pipes and installation of UPVC pipes for transmission and distribution.

Hydrotech supported pipeline rehabilitation in the Greater Banjul Area through the dismantling of existing asbestos pipes and installation of UPVC pipes for water transmission and distribution.

Scope of work

  • Controlled dismantling of existing pipe sections
  • Installation of UPVC transmission pipes
  • Installation of UPVC distribution pipes
  • Fittings, accessories and site reinstatement
Previous projectBangally Control RoomNext projectWater Network Works

Start a conversation

Discuss a similar project with Hydrotech.

Share your project location, current stage and required support.

Discuss a similar project